Browse by category

PVC and CPVC Pipe

Schedule 40 and Schedule 80 PVC pipe for cold water, drainage and chemical service, and CPVC pipe rated for hot water and higher-temperature process lines up to 200°F. Search by diameter and schedule, or describe the application and let ChatMRO match the pipe.

  • 30M+ parts indexed
  • Procure in < 60 seconds
  • No credit card required

Searchable by Spec

Indexed on full specifications rather than titles alone, so a spec can be searched directly.

Backed by Raptor Supplies

The same suppliers, pricing desk and people standing behind every quote.

US & Worldwide

Serving the US, with fulfilment across the UK, EU, Singapore and Australia.

Technical Foundation

What Is a PVC and CPVC Pipe?

PVC (polyvinyl chloride) pipe is rated for service up to 140°F and is standard for cold water supply, drain-waste-vent (DWV), irrigation and many chemical process lines. CPVC (chlorinated polyvinyl chloride) is chemically modified with additional chlorine content, raising its maximum service temperature to roughly 200°F, which makes it the standard choice for hot water supply lines and process piping that PVC's lower temperature rating would not tolerate.

Schedule (40 or 80) describes wall thickness relative to outside diameter, not pressure rating directly — Schedule 80 has a thicker wall than Schedule 40 at the same nominal size, giving it a higher pressure rating and impact resistance at the cost of reduced internal flow diameter. Both PVC and CPVC pipe are typically solvent-welded, so fittings, primer and cement must be matched to the same material — PVC cement does not properly bond CPVC pipe and vice versa.

Prefer a quick quote?

Get PVC and CPVC Pipe Pricing in Your Inbox

Skip the search — tell us the pipe diameter, schedule and service (water, drain or chemical) and we will come back with pricing.

SpecWhat It MeansWhy It Matters
MaterialPVC vs. CPVCCPVC withstands higher temperatures (up to ~200°F) than PVC (~140°F max)
ScheduleSchedule 40, Schedule 80Schedule 80 has thicker walls, higher pressure rating, and reduced flow ID at same nominal size
Pressure RatingVaries by diameter and schedule, e.g. 280-450+ psiRating drops as pipe diameter increases at a given schedule — check the size-specific chart, not a general number
Joint MethodSolvent weld, threaded (Sch 80), flangedSolvent cement and primer must match the specific pipe material — PVC and CPVC cements are not interchangeable
Application ClassPressure pipe vs. DWV (drain-waste-vent)DWV pipe is not pressure-rated and should not be used on pressurized supply lines

Shop PVC and CPVC Pipe

Browse PVC and CPVC Pipe Sub-Categories

Organised by schedule and material. Pick a sub-category, or describe the fluid, temperature and pressure and let ChatMRO match the pipe.

How it works

From Half-Remembered Part Number to PO, in Three Steps.

01

Ask

Type an MPN, paste a spec sheet, or describe the part in plain English. ChatMRO understands engineer-speak.

02

Compare

Side-by-side specs, cross-references, and equivalents from multiple sources — without the clutter of endless browser tabs.

03

Quote & Buy

Request a quote or add to cart. Volume discounts, VAT-aware pricing, and consolidated procurement — all in one place.

Applications

Where PVC and CPVC Pipe Get Used

PVC and CPVC pipe are specified across water supply, drainage, chemical, and process piping wherever corrosion resistance and lighter weight than metal piping are priorities.

Plumbing & Water Supply

Schedule 40 PVC for cold water distribution and CPVC for hot water supply lines in residential and commercial buildings.

Chemical Processing

Schedule 80 PVC and CPVC piping for corrosive chemical transfer where metal piping would corrode.

Irrigation & Agriculture

Schedule 40 PVC pipe for buried irrigation mains and lateral distribution lines.

Wastewater & Drainage

DWV-rated PVC pipe for building drain, waste, and vent systems.

Pool & Spa Systems

Schedule 40 PVC pipe for pool circulation, filtration, and equipment plumbing.

Industrial Process Piping

CPVC piping for hot process fluid transfer where temperature exceeds standard PVC's rating.

FAQ

PVC and CPVC Pipe Questions, Answered

Can I use PVC pipe for hot water supply lines?

No — standard PVC is rated to roughly 140°F maximum, and typical residential hot water can regularly exceed that at the tap or heater outlet, causing the pipe to soften and potentially fail. CPVC, rated to approximately 200°F, is the correct material for hot water supply lines.

What's the practical difference between Schedule 40 and Schedule 80 PVC pipe?

Schedule refers to wall thickness at a given nominal pipe size — Schedule 80 has a thicker wall than Schedule 40, giving it a higher pressure rating and better impact and abrasion resistance, but a smaller internal flow diameter at the same nominal size. Schedule 80 is typically specified for higher-pressure service, threaded connections, or exposed piping subject to physical impact.

Can PVC cement be used to join CPVC pipe?

No. PVC and CPVC require solvent cements formulated for their specific chemistry — while some universal cements are rated for both materials, standard PVC-only cement will not properly bond CPVC pipe and can result in a joint that leaks or fails under pressure. Always confirm the cement is rated for the specific pipe material and check local code for approved cement types.

What's the difference between DWV pipe and pressure-rated PVC pipe?

DWV (drain-waste-vent) PVC pipe is designed for gravity-fed, non-pressurized drainage and venting and is not rated for pressurized service. Pressure-rated PVC (Schedule 40/80) is manufactured and tested for continuous pressurized flow. Using DWV pipe on a pressurized supply line is a code violation and a safety risk — the two are not interchangeable despite sometimes looking similar.

How do I determine the correct pipe diameter for my flow requirement?

Pipe sizing depends on required flow rate, acceptable pressure drop, and pipe length and fittings in the run — undersizing increases velocity and pressure loss, while oversizing adds unnecessary material cost. For water supply lines, plumbing codes typically provide sizing tables based on fixture unit counts; for process or industrial lines, a flow/pressure-drop calculation specific to the fluid and system is recommended rather than sizing by habit.

Keep browsing

Related Categories

Explore More

Find Your Next Part Now.

Describe a part number, spec or what it does.