Brands · Bison Lifting Equipment

Find The Right Bison Lifting Equipment Part, Just By Asking

Bison electric chain hoists, manual chain hoists, lever hoists for material lifting. 1-ton to 10-ton capacity, Grade 80 steel chain.

  • 30M+ parts indexed
  • Procure in < 60 seconds
  • No credit card required

About Bison Lifting Equipment

Bison Lifting Equipment Heavy-Duty Material Handling Solutions

Bison Lifting Equipment manufactures durable, cost-effective lifting solutions engineered for factories, warehouses, construction sites, and service facilities. The company's portfolio spans manual chain hoists (hand-operated, no power required), electric chain hoists (single-phase and three-phase power, varying speeds), and lever hoists (ratchet-based portable pullers), all built with Grade 80 high-tensile steel chain and heavy-duty cast iron load frames designed to handle shock loads and cyclic duty.

Manual chain hoists from Bison come in 1/2-ton through 10-ton capacities with standard lift heights of 10 and 20 feet, ideal for job shops and locations without reliable electrical power. Ratcheting load chain and mechanical load brake ensure the load stays suspended safely even if the operator releases the handle, critical for overhead rigging in OSHA-regulated environments where accidental load drop is catastrophic.

Electric chain hoists integrate thermal overload protection, limit switches (upper and lower travel stops), and heavy-duty motors available in single-phase (115V/230V, for portable applications) and three-phase (208–480V, for fixed-mount installations). Dual-speed models (high speed for light lifts, low speed for heavy/awkward loads) are common in automotive and aerospace assembly where cycle time and load control both matter.

Lever hoists (hand-powered ratchet pullers) from Bison are portable, compact, and require no electrical setup — ideal for emergency rigging, vehicle recovery, and tensioning steel cable in fabrication. Standard capacities are 1.5–6 tons with mechanical load hold; these are often used in conjunction with wire rope or synthetic sling systems where chain alone isn't practical.

ChatMRO indexes Bison hoists by lifting capacity, power requirement (manual, 120V, 240V, three-phase), load chain grade (Grade 80, Grade 100 specialty), and lift height standard, cross-referencing to competitor products and certifications (ASME B30.16 chain hoist standard). Specify your duty cycle (light, medium, heavy) and application (assembly, maintenance, rigging) to ensure correct hoist selection and safety factor.

Prefer a quick quote?

Get Bison Lifting Equipment Pricing in Your Inbox

Specify hoist type (manual/electric/lever), capacity, lift height, and power availability — we'll confirm exact Bison model and warranty.

Frequently asked questions

What's the difference between Bison manual, electric, and lever hoists for my production line assembly?

Manual chain hoists ($300–$800) are lowest cost and require no power, ideal for intermittent rigging and portable job-site work — typical cycle is 1 lift per minute by hand pulling; labor-intensive but no downtime risk from electrical failure. Electric hoists ($1200–$3500) are 3–10x faster (20–40 lifts per minute with motorized chain drive), essential for high-volume assembly or where operator fatigue is a safety concern; rely on power availability and add upfront cost. Lever hoists ($400–$1200) are middle-ground portable solutions for emergency towing or load tensioning where fixed-point rigging applies. Choose manual for low-frequency rigging, electric for repetitive production assembly, and lever for field emergency work.

What's a 'Grade 80' chain hoist, and why does chain grade matter for my lifting application?

Grade 80 chain is heavy-duty, heat-treated steel with tensile strength rated for shock loads and repeated lifting cycles — 80 refers to the breaking strength in tons per unit cross-section. Grade 100 and Grade 120 chains are premium, higher-strength alternatives for extreme-duty or subsea rigging, but Bison's standard Grade 80 is 99% sufficient for typical industrial rigging. Lighter 'Grade 30' or ungraded chains are common on cheap imports and fail prematurely under shock (dropped loads, jerky starts); always specify Grade 80 minimum for safety-critical work governed by OSHA or ASME standards.

Can I run a Bison single-phase electric hoist from a standard 120V household outlet, or do I need a dedicated circuit?

Bison single-phase hoists (1–3 ton, typical duty) can run on household-type 120V or 240V, but OSHA and the National Electrical Code (NEC) mandate a dedicated 20–30A circuit breaker with proper grounding for any fixed or semi-permanent lifting installation. Portable/temporary hoists may use heavy-duty extension cords if necessary, but permanent shop installations must have hard-wired, code-inspected electrical. ChatMRO's safety guidance and electrical specification documents clarify wiring requirements and recommend electrician involvement for code compliance.

How often should I inspect and maintain a Bison hoist, and what are critical wear items?

ASME B30.16 (Chain Hoist Standard) requires documented inspection before initial use, then every 12 months for rated-capacity load testing on fixed-mount hoists, and daily pre-shift visual checks (no visible damage, chain doesn't skip, load brake holds under load). Wear items are load chain (replaced when any link shows 10% or more wear depth), motor brushes (if electric, every 2–3 years), and load brake pads (inspect annually). ChatMRO's preventive maintenance schedule and parts availability tool help fleet managers track inspection intervals and budget for replacement parts before failure causes downtime.

What's the difference between 'single-speed' and 'dual-speed' Bison electric hoists?

Single-speed hoists maintain constant lift speed (typically 20–40 fpm at rated capacity), economical and simple but sometimes frustrating for operators who want to slow down for precise positioning of heavy/awkward loads. Dual-speed electric hoists run fast (40–60 fpm) for empty/light loads to reduce cycle time, then automatically shift to slow speed (10–20 fpm) once the load approaches rated capacity, improving operator control and reducing shock to the rigging. Dual-speed costs 20–30% more but is standard on modern production lines for safety and precision; single-speed is acceptable for simple repetitive lifts where speed over control is preferred.

Explore More